欧美极度肠交另类_国产91视频地址_日本在线看视频亚洲_国产仑伦乱老女人一区二区_亚洲精品国产无码毛片,欢乐颂小说在线阅读,欢乐颂小说txt,盗墓笔记全集

Contact Us

Industrial Ventilation Fan tips

Date: 2014-10-13   Click: 1701 Times

Before "Industrial Ventilation Fan" installation
1, the fan should be checked before installing it is intact, fastener bolts are loose or fall off, if collisions impeller cover. Carefully check the fan or blinds during transport without deformation damage.
2, the installation select export environment, you should pay attention to the socket can not have too much ~ ~ face obstacles in 2.5-3M's.
When "Industrial Ventilation Fan" installation
A smooth installation: the installation should pay attention to the horizontal position of the fan, the fan and mounting the motor to adjust to a solid foundation can not have tilted horizontal plane.
2, the fan should be installed so that the motor in position adjustment bolts, easy to operate. Adjust the belt tension when convenient to use.
3, when installing the fan bracket, be sure to let stand firm and level ground plane, reinstall the angle iron reinforcement if necessary, the next fan.
4, after installing the fan, check the tightness around. If this gap is, the available solar panels sealed plastic or glass.
After installation "Industrial Ventilation Fan"
1, after the installation is complete, check the internal fan to stay estate tools and debris. Hand or toggle lever blades, check whether tight or collision phenomenon, whether the project did not interfere with the rotation of the test run before the exception.
2, in operation, if there is vibration or fan motors have "buzz" abnormal sounds or other anomalies, should stop to check, repair, and then get started.

Back to: Industry news

+86-0769-83660708

Home Product News Contact

主站蜘蛛池模板: 沾益县| 湘潭市| 雷波县| 吉首市| 兴宁市| 连平县| 兖州市| 阿勒泰市| 西乌珠穆沁旗| 柏乡县| 资中县| 大宁县| 古蔺县| 洛南县| 武强县| 西畴县| 四子王旗| 娱乐| 云浮市| 宁夏| 北海市| 乐山市| 巴彦淖尔市| 兴仁县| 锡林郭勒盟| 北流市| 合川市| 南投县| 扎兰屯市| 偃师市| 山阳县| 绥宁县| 平远县| 策勒县| 施秉县| 牙克石市| 龙口市| 通道| 姜堰市| 甘孜县| 四子王旗|