欧美极度肠交另类_国产91视频地址_日本在线看视频亚洲_国产仑伦乱老女人一区二区_亚洲精品国产无码毛片,欢乐颂小说在线阅读,欢乐颂小说txt,盗墓笔记全集

Contact Us

Inflatable Air Blower cleaning process

Date: 2015-1-5   Click: 1576 Times

Finishing "Inflatable Air Blower" must pay attention to the fan power cord and clip the button, the line to be sorted out in advance, do not let the fan run when working on the line to produce a variety of contact, the power cord is in the initial position of the fan in general (both removed available).
Adjust the position of the radiator
The radiator tune in the right place, the place "Inflatable Air Blower" level to the processor port cover side, four point deduction buckle clasp around the column (beak antennae) in the bottom of the need to align with the motherboard. The radiator tune into the right position, the fan will be placed horizontally to cover the processor port side, the four point deduction buckle clasp around the column (beak antennae) in the bottom of the need to align with the motherboard. Motherboard Intel processor buckle hole distribution in the vicinity of the CPU socket, the user can easily observe the board found. Intel original radiator have to look at before installing rotary switch is fully restored in situ. "Inflatable Air Blower" As a result of the heat sink clip clip pressed four buckle design, so the best way is to install the clip "diagonal" push installation method. Order push uneven force likely to cause the fan, causing the other two buckle pressing difficulties.

Back to: Industry news

+86-0769-83660708

Home Product News Contact

主站蜘蛛池模板: 玉龙| 周口市| 盐城市| 易门县| 灵石县| 安国市| 临清市| 芜湖市| 垦利县| 通海县| 衡阳市| 建阳市| 阿拉善左旗| 宣城市| 榆树市| 陕西省| 格尔木市| 八宿县| 肇源县| 新和县| 合川市| 琼中| 长岭县| 蒲城县| 昌乐县| 朝阳市| 灵寿县| 健康| 乌拉特中旗| 神木县| 江永县| 光泽县| 延长县| 绩溪县| 旺苍县| 喀喇沁旗| 滦南县| 龙胜| 股票| 怀来县| 德江县|