欧美极度肠交另类_国产91视频地址_日本在线看视频亚洲_国产仑伦乱老女人一区二区_亚洲精品国产无码毛片,欢乐颂小说在线阅读,欢乐颂小说txt,盗墓笔记全集

Contact Us

Micro Cooling Fan power telemetry

Date: 2014-12-17   Click: 1657 Times

The correct use of "Micro Cooling Fan" telemetry end of the power of many high-current power supply has telemetry terminal (+ S, -S). Telemetry allows the power supply terminal is connected via an internal adjustment circuit test line and load, which affects the large current line drop compensation effect of load values. Figure 9-20 shows a proper connection with the load-side power telemetry. Figure test line and a large current load line separation, telemetry end direct detection voltage across the load. If high-current load line has 0.5V voltage drop through telemetry end, the internal power supply circuit to adjust the output voltage increase 0.5V line drop compensation, "Micro Cooling Fan" to ensure that the voltage rating of the load. General Power line drop compensation can load about 1.0V. This improved method is to use the power supply output voltage across the load to maintain an accurate voltage value. Telemetry cable end and the load should be shielded to avoid electromagnetic interference inside the power supply adjustment circuit. "Micro Cooling Fan" in the internal power supply, there is usually a resistor (see Figure 9-20) telemetry between the terminal and the power output, such as telemetry end due to carelessness and not connected to the load side, this resistance prevents the output voltage rise too high. If you do not have telemetry end, respectively, and the power supply should be positive and negative terminals shorted, then the power to work in the local detection.

Back to: Industry news

+86-0769-83660708

Home Product News Contact

主站蜘蛛池模板: 尼玛县| 三门峡市| 辽中县| 盘山县| 平江县| 乌什县| 白城市| 炎陵县| 洪江市| 双柏县| 许昌县| 高要市| 温宿县| 临泽县| 利川市| 惠来县| 博野县| 镇宁| 虹口区| 中方县| 嘉祥县| 平江县| 泾阳县| 沐川县| 习水县| 开化县| 吉林省| 平乡县| 桃园县| 稻城县| 绥江县| 英吉沙县| 大连市| 苗栗市| 仁布县| 阳春市| 海原县| 察隅县| 石景山区| 马边| 金乡县|